PURGE VALVE > INSTALLATION |
for Preparation Click here
1. INSTALL PURGE VSV |
Install the purge VSV with the bolt.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Connect the connector.
2. CONNECT PURGE LINE HOSE |
Connect the 2 hoses.
- HINT:
- Turn the claw of the clip to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.