SHIFT LEVER ASSEMBLY (for Floor Shift Type) > REASSEMBLY |
for Preparation Click here
1. INSTALL SHIFT LOCK CONTROL ECU |
Attach the 3 claws to install the ECU to the floor shift.
Connect the shift lock solenoid connector.
2. INSTALL SHIFT LOCK RELEASE BUTTON |
Attach the 2 claws to install the button.
Attach the 4 claws to install the position indicator housing.
3. INSTALL INDICATOR LIGHT WIRE SUB-ASSEMBLY |
Align the wire with the key part of the position indicator housing lower, and install the wire. Then rotate the wire clockwise until it locks.
Securely connect the 2 wire terminals to terminal 4 (ILL+) and 8 (ILL-) of the transmission control switch connector. Then push the connector housing retainer to lock it.