Workshop

FORD 5R110W TorqShift

AUTOMATIC TRANSMISSION SERVICE GROUP
Technical Service Information
87
Copyright © 2004 ATSG
NUMBER 10
THRUST WASHER
NUMBER 10
THRUST WASHER
2003/2004 MODELS 2005/UP MODELS
Copyright © 2004 ATSG
NUMBER 11
THRUST BEARING
NUMBER 11
THRUST BEARING
2003/2004 MODELS 2005/UP MODELS
FORWARD
PLANETARY
RING GEAR
FORWARD
PLANETARY
RING GEAR
Figure 142
Figure 141
8. Install the proper number 11 thrust bearing in
the direction shown in Figure 141, and retain
with liberal amount of Trans-Jel®.
9. Install the proper number 10 thrust washer onto
the forward ring gear, as shown in Figure 142,
with Trans-Jel®.
10. Set the completed forward planetary carrier
and the completed forward ring gear aside for
the drum assembly process.
11. We are now ready to assemble the drums and
and front gear train, but first look at the sun
shell differences on Page 89.
FORWARD PLANETARY SYSTEM (CONT'D)
COMPONENT REBUILD
Continued on Page 90

Leave a Reply

Your email address will not be published. Required fields are marked *