MASS AIR FLOW METER > INSTALLATION

for Preparation Click here



1. INSTALL MASS AIR FLOW METER


    A111698
  1. Install a new O-ring to the MAF meter.

  1. Install the MAF meter with the 2 screws.

  1. Connect the MAF meter connector.



2. INSTALL V-BANK COVER

Torque:
7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


4. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.